Endeavor Consortium Work Group
March
2, 2007
KCTCS,
Versailles
Present:
Clara
Logsdon, St. Catharine
Tari
Keller, UK
Kelly
Vickery, UK
Todd
King, EKU
Margaret
Foote, EKU
Michael
Stapleton, KCTCS
Paul
Fuller, KCTCS
Perry
Bratcher, NKU
Sheri
Myers, NKU
Enid
Wohlstein, KYVL
Granuaile
O'Flanagan, Morehead
Leonor
Lopez, KSU
Margaret
Hecker, KSU
Don
Kim, Murray
Rose
Davis, WKU
Nelda
Sims, WKU
Alex
Grigg, Lexmark
Linda
Voyles, Ex Libris
John
Detwiler, KDLA
___________________
Update from Linda Voyles on Ex Libris:
- Ex Libris is moving to a new
CRM (Pivotal?) which "should be an
improvement".
- All the developers and managers
from Ex Libris are supposed to
be
at EndUser 2007.
- Voyager 6.5 should be in field
testing in April.
- Voyager 7 should be in general
release in Q1 2008. It will
include
the enhancements voted for, some changes to WebVoyage (mainly cosmetic and
accessibility stuff), "standard support interoperability", and
some integration with things like Verde.
- AIX will continue to be supported.
Update from Enid on KYVL:
- In the next couple of weeks
KYVL should be interviewing for the
electronic
resources librarian position that has been vacant since Tim Chase left.
- Staff changes in KYVC and
CPE: Miko is now senior advisor on
special
projects and the new CIO for CPE is Stuart Johnston.
- No news yet from the
Legislature about the ten million dollar tech bond.
- Enid is working
on updating the wish list for the six-year
capital
plan (available online at the LRC website). VLAC has been asked for
suggestions. ECWG members can submit suggestions and these should be
in by about Wednesday, March 7. Remember: be vague, truthful, and
compelling.
- Michael Stapleton talked a bit
about the Portal Work Group's efforts with the Metalib product. They
are looking at forming a consortium.
- KYVL needs to implement the
software but doesn't have the hardware.
Upgrade reflections - Any outstanding
issues?
UK:
- Experiencing some trouble with double-entries on missing-in-transit report.
- There are also problems with
call slips and recalls when charging
some things at a particular location.
Morehead:
- Users with Windstream have
trouble accessing the online catalog
system.
- The authorized headings report
will run for shorter intervals but not for
an entire year.
- Sometimes item available
notices that should email do not email.
NKU:
- Item record link problem.
There was some
discussion about renaming the workgroup.
The meetings for
the rest of the year have been scheduled for the following dates:
*
May 31
*
September 7
*
December 7
Michael
Stapleton has agreed to give another update on Metalib for the next meeting.
Submitted by:
John Detwiler
Kentucky
Department for Libraries and Archives 300 Coffee Tree Road, Frankfort,
Kentucky
40601 502.564.8300 x228 john.detwiler@ky.gov